Friday, 5 November 2010
Finishing the tail
Monday, 26 July 2010
Door Gaps
I just thought this method up on the fly......
- First, fit the doors as best you can.
- In my case I could get a good constant gap along the lower sill edge.
- This gave me uneven gaps at the front & rear edges.
- Draw a line along the door skin parallel with the edges (see photos).
- At the areas where the gap needs work, draw measurements of how much extra metal is needed.
- Sand the edge back to metal and carefully build up a bead of weld (see photos).
- Be careful not to do too much in one spot at one time (see photos).
- Finally, grind back the weld to meet your measurements.
It will need just a skim of filler or even a heavy undercoat filler would do. Here are the photos in the sequence above....
Monday, 3 May 2010
Final Panel Fit
Now that the chassis modifications and frame have been "ok'd" by my vehicle engineer, it's time to perform final measurements on the overall frame itself and then test-fit the bolt-on panels in preparation for paint.
I will update this post with final pictures of the panels in place. Hopefully my '67 Shelby bonnet (fibreglass skin on metal frame) will be around by then....
Wednesday, 4 November 2009
Floor & Subframe
The photo below shows how things look from underneath. While it's easy to spot the sub-frame connectors, keen eyes will spot the box chassis running in the sills and keener eyes will see the front-seat mounting rails as they attach to the sills on the outer edges of the floor (and are cut into the floor-pan at the outer edges).
Note that I've made a custom frame-rail that used to be in place where the rear engine mount bolted on. I've put this piece back in the same location in case a small-block is ever re-installed in the car, but it is extended upwards by about 2 inches to cater for the trans-tunnel being raised by this amount to fit the big-block/tremec driveline combination.
From this point on, the rest of this post is the same - showing the lead-up to completing things above. I am ready now for my first vehicle inspection from an engineer that works with the state traffic authorities. That person will deem this chassis safe (or show me where to fix things) so I can move on to final panel & bodywork items (to fix) in preparation for paint and assembly.
Previous post info.............
Then again, I also went for a custom sub-frame that's cut into the floor to give me "near stock" ground clearance under the car. I nearly didn't put in the sub-frames, but with the chassis not being a suitable spot to run my battery leads, fuel lines, Cat6 Ethernet & wiring harness - they have become the best way to both strengthen the car further as well as hide & protect the above items.
The following photos show the basic approach I've taken.......
First I manufactured the sub-frames that tie the front & rear frames together.
Getting the angles right on these was "fiddly" as I wanted to ensure it was as easy as possible to push the conduit & fuel lines through.
Next I lay the floor pans in position to mark out and then cut out the slots to allow the new sub-frames to push up into both floors as the floor pans themselves were lowered into position.
Once happy after a few last moment passes with the grinder ("flapper" disks are fantastic tool I've discovered!) to get a perfect custom fit, I clamped and then welded the floors to the front frame-extensions (via plug welds), the connectors and the rear floor (under the rear seat). Oh - and of course you can see the copper "weld thru" primer on the parts that will get covered up as well as the custom "humps" I had to include in the floor pans to clear the custom rear transmission mount. It all takes time...........
You can see the way they are nicely "cut in" to the floor. At their lowest point on the car, they protrude 1" into the cabin and 1" below the floor.
You can see the way it all finished up nicely in the photo below - even before I've finally welded the floors all along their inner edges (to the trans-tunnel) and outer edges (to the inner sill panels).
Now you can see my firewall templates being installed. I had originally created a single steel sheet (after making a cardboard template) but had to split it into two sections just so I could handle it properly and get the best final fit. You can see where I've marked it to make various recesses for the heads, for the "bend-lines" to start the transition to the trans-tunnel, etc.
The photo below shows things close to complete. I've grafted the firewall section from the original firewall in place to allow the RRS under dash pedal-box to bolt in. You will also notice the notched cross-brace and recess in progress. And lastly, it was great to bolt the steering wheel & column back in - as that makes it start to look like a real car again. You can see I did a trial fit that included the steering rack to ensure no binding in the universal joints would occur.
In terms of strength, the shell will be quite rigid I'm sure. No doubt I'll "pay" for that however with a harsher ride, but that's a small price in my opinion. Something I will need to keep an eye on now though is the front pillars (where they join the cowl and roof) - as this would be my logical weak spot(s) and thus a place to flex and cause paint cracking. More on what I'm doing to mitigate that potential problem in another post though.....
Friday, 28 August 2009
Firewall & Engine fit.
You can see below how I scalloped it and radiused the edges. I've also allowed enough room to shift the block forward or back a few inches from my initial "default" location.
There is still a good half inch or more room between the spinning crank & rods and the bottom of the sump at the new scalloped section.
Now you can see the block being "enticed" into position......
All ancillaries that need to be catered for (for firewall and extractor construction) are bolted on so I don't get surprises when doing the final installation.
Now you can see the Tremec bolted up and i've raised the tran's tunnel 2 inches to give me just enough "wiggle-room" to make future driveline installations easy enough as well as include the cross-member that welds in between the frame extensions at this point. Thankfully, the standard rear engine mount from an Australian '72 to '79 Falcon bolts right onto the Tremec with no mod's and fits perfectly between the frame extensions. I have however had to modify Mustang floor pans to clear the rear cross-member "humps" (that allow for the twin exhausts to pass thru).
Below you can see the block now sits nicely in the engine bay and the transmission is perfectly centered.
And below you can see (if you enlarge the photo) the room I have available to construct my custom headers....
Notice the marker pen scribble on the sheet-metal.... this is where I am "indenting" the firewall to provide adequate clearance around the motor.
And below you can see the tight fit with the final positioning. But the important thing is that it does fit!
And finally below you can see my "helpers" having a bit of fun!
Wednesday, 29 July 2009
Firewall - interim update
But in order to test fit the driveline (to complete the firewall), I had to finally receive my......
- Tremec TKO 600
- Quicktime bell housing
- Flywheel (lightened)
- Clutch (11 inch, plus hydraulic throw-out bearing)
- Reduction starter
- Rocker covers
- plus various miscellaneous parts
As can be seen above, these allow me to "button up" the block enough to keep it sealed from dirt & humidity yet have the outside dimensions in place to form the firewall and trans-tunnel.
Pictures of first attempted "engine fit" are shown below. There is just under an inch of clearance from the top of the shock towers to the rocker covers.
I can drop the engine down anther inch or two and still have the bell housing sit high enough from the ground - after I cut out some of the dry-sump where it contacts the rack & pinion setup. As I'm having a front and rear sump scavenge system, scalloping the centre section slightly is no problem.
The tall rocker covers fit over the stud girdle. It's a tight fit in terms of engine bay width - but it fits non-the-less. The shot above shows how far back I can set the block for better weight distribution.
However, I am seriously considering fabricating some "sliding" engine mounts to push it back a further 2 inches (once I drop it an extra inch after the sump mod's). The motor would then slip back in under the lower cowl panel nicely. Sliding mounts would then let me slide the engine forward quickly when I need to lift the rocker covers.
Anyway, lot's to do now in terms of "Metalwork 101" to get the firewall sheetmetal right.
Regards, Spiderman.
Monday, 6 July 2009
Installing the RRS steering rack
Here is the RRS rack I just received & unpacked. It comes complete with the universal-joints, telescopic steering shaft, bearings and all the goodies to modify the steering column as well.
And here it is an hour or so later after it bolted right in with no dramas at all.
As per the instructions, all I needed to do was drill 4 holes (2 each side) in the lip of the chassis rail and in it all went.
One thing I have noticed is that the rack bolts in right where the chassis lip is recessed (cut back) to give clearance for the inner rear edge of the tyre at full steering lock. We will see if there is any interference later I guess when I put on my chosen rim/tyre combo. At least the steering bump-stops are adjustable on the rack so I can ensure I can stop the tyre hitting if there is a problem. But of course I'd rather get as much steering lock as possible so hopefully this wont be an issue.